Abstract:The severe weather occurred frequently in whole country for recent years, and this forms a great threat for stable operation of transmission lines and power plants. Aiming at the “11.5” accident of Togtoh Power Generation Company Limited in 2012, in which three of four output transmission lines of the company tripped successively due to severe snow and ice disasters, the operation mode of power units under extreme weather was put forward. The measures for resuming important power sources after the whole plantscope auxiliary power outage accident occurred were introduced, which are useful for ensuring the equipments of the power plant to operate safely and stably.