Loading...

Table of Content

    25 September 2017, Volume 39 Issue 9
    Interval integration design for in situ relay protection of transformer substation
    ZHAO Qian1,2, ZOU Lei1,2, CHEN Fufeng1,2, XUE Mingjun1,2, GONG Shimin1,2, LI Yuping1,2
    2017, 39(9):  1-5. 
    Asbtract ( 276 )   PDF (1084KB) ( 935 )  
    Related Articles | Metrics
    Facing the in situ integration demands of relay protection of transformer substation, this paper carried out integration and optimization design for the relay protection devices of medium and high voltage lines in transformer substation, which integrated distributed bus protection, merging units, intelligent terminals, measuring and controlling function, etc. This design scheme mainly adopted the methods of physical integration of devices and independent functional modules. Through analyzing and testing, this design scheme could improve the reliability and realtime performance of protection sampling, reduce the number of devices and cabinets, increase information processing efficiency and simplify wiring in smart substations.
    Influence of series compensated double circuits on the same tower zerosequence component to relay protection
    XUE Mingjun1,2, WANG Yuting1,2, CHEN Fufeng1,2, ZOU Lei1,2, ZHANG Xiang1,2, CHEN Shi1,2
    2017, 39(9):  6-9. 
    Asbtract ( 298 )   PDF (814KB) ( 597 )  
    Related Articles | Metrics
    Utilizing installed series capacitor double circuits on the same tower grounding failure zero sequence network, the influence of the zerosequence power direction element and zero sequence differential protection on the two sides protection installation is analyzed in the case of high resistance failure at the outlet of the string and the failure of the MOV. Analysis indicated that series compensation capacitor may lead to far away from the side of series compensation protection of zero sequence power direction relay from action, as a protection of high resistance earth fault zerosequence differential protection sensitivity and the lower even refused to move. The simulation test verifies the correctness of the theoretical analysis and puts forward the principle of the main protection.
    Utilization of uniform strength beams device to verify accuracy of noncontact strain measuring system study
    JIN Hongze, KONG Chuiyu, GUO Ningbo
    2017, 39(9):  10-12. 
    Asbtract ( 220 )   PDF (1628KB) ( 565 )  
    Related Articles | Metrics
    Full field strain was measured by noncontact strain measuring system in homemade uniform strength beams device. The result was compared and analyzed with calculated value. And the result proved that noncontact strain measuring system accurately measured strain of uniform strength beams.
    Acoustic agglomeration dust removal online test device development and application
    XIE Jiankun, CHU Hao, XIA Ruifang, SHU Zhongping
    2017, 39(9):  13-15. 
    Asbtract ( 232 )   PDF (1248KB) ( 642 )  
    Related Articles | Metrics
    To solve the problem of existing power plant dust removal equipment has difficulty on removing micrometer and submicrometer particulate matter, acoustic agglomeration dust removal online test device was developed based on acoustic agglomeration theory and flow field transformation simultaneous separation. Primary test and research used power plant desulfurized flue gas. The influence of acoustic agglomeration on PM10 grain size distribution and demister outlet total dust mass density was analyzed. This provided test evidence for application of acoustic agglomeration in industrial area.
    Coalfired unit primary frequency modulation performance increasing study
    NI Xinyu, SHI Zheng, FANG Li
    2017, 39(9):  16-19. 
    Asbtract ( 239 )   PDF (935KB) ( 712 )  
    Related Articles | Metrics
    In ultrahigh voltage power gird receiverside, primary frequency modulation became more and more important. Large scale coalfire power is responsible for primary modulation, but many units cannot achieve expected performance, and problems barely can be detected by performance tests. By analyzing tested units, prohibition and frequency modulation counter action logic was indicated. Corrected sliding pressure curve, which increases frequency modulating ability, and corrected feedforward coefficient was provided. This could be referred by different kind of unit.
    Transformer insulation aging diagnosis based on D-S evidence theory
    XU Yinqing
    2017, 39(9):  20-22. 
    Asbtract ( 234 )   PDF (880KB) ( 510 )  
    Related Articles | Metrics
    To effectively evaluate transformer insulation aging, the evaluation model based on fuzzy mathematics and D-S evidence theory was indicated. By the method of no power failure detecting transformer insulation status, four parameters were measured. These four parameters were fuzzed through membership function into four independent evidence bodies. And diagnostic result was calculated by the powerful uncertain information process ability of D-S evidence theory. Multiple allocations proved the effectiveness of this model.
    Full master localized transformer protection realization plan
    HU Bing1,2, GUO Xiao1,2, CHEN Fufeng1,2, LI Yuping1,2, XING Wu1,2, WANG Zhe1,2
    2017, 39(9):  23-26. 
    Asbtract ( 283 )   PDF (952KB) ( 640 )  
    Related Articles | Metrics
    To enhance the speed and reliability of existing intelligent substation transformer protective device, a full master type distributed localized transformer protection plan was introduced. Protection submachine was provided to each side of transformer. Submachines communicated with each other by internal high speed loop network. Each submachine was equipped with full protective function. Switch will be tripped through cable if protection behavior activated. Based on the overall plans comparison, triple layer network communicating mechanism, remote humanmachine interface and other key technologies were discussed.
    Foreign large scale thermal power plant auxiliary power system study
    YANG Guanglei, ZHANG Bangbin
    2017, 39(9):  27-30. 
    Asbtract ( 284 )   PDF (1146KB) ( 941 )  
    Related Articles | Metrics
    Based on the research and study on a few foreign power plants, different kinds of wiring methods of auxiliary power system were analyzed. The application of common segment and necessity of special standby was discussed. After comparing the economical efficiency of two solutions, anappropriate wiring method for power plants in southeast Asia region was indicated. This wiring method was approved feasible by simulation in simulink.
    New and existing distributed control system replacement discuss
    XIAO Sheng1, GUO Bochun2
    2017, 39(9):  31-33. 
    Asbtract ( 216 )   PDF (817KB) ( 946 )  
    Related Articles | Metrics
    Distributed control system (DCS) reformation proposal shall fundamentally better than existing system. Different suppliers will increase the complexity. Hardware distribution, software configuration and cable wiring design was analyzed and studied. This could be referred for reformation of similar type DCS.
    Direct air cooling system fan frequency converter group water cooling system study
    CUI Chao
    2017, 39(9):  34-35. 
    Asbtract ( 239 )   PDF (764KB) ( 705 )  
    Related Articles | Metrics
    Direct air cooling system frequency converter usually aligned concentratedly, and often caused over temperature alarm in summer. After cause analysis, the plan that adds water cooling system was introduced. Actual operation proved that this plan is effective and able to save energy and prolong converter lifespan.
    Fan gearbox lubricant cleanliness control strategy
    ZHANG Lifeng
    2017, 39(9):  36-38. 
    Asbtract ( 257 )   PDF (728KB) ( 1391 )  
    Related Articles | Metrics
    Gearbox is one of the core components of fan. Lubricant filter system will help maintaining lubricant cleanliness, and extend fan gearbox lifetime, increase transmission efficiency. Gearbox lubricant impurity and harm was analyzed. By lubricant quality test, effectiveness of online filer system and offline fine filter system was indicated. Method to control lubricant cleanliness was summarized.
    Application of computing type pH analysis meter in nuclear power plant
    GAO Wei1, XING Jiehua1, ZENG Mingmin2
    2017, 39(9):  39-41. 
    Asbtract ( 211 )   PDF (735KB) ( 601 )  
    Related Articles | Metrics
    An interference factor of traditional pH analysis meter analyzing pure water was introduced. Difficulties of nuclear power plant low conductivity water pH value measuring were analyzed. Based on the special requirement of pH analysis meter of pressurized water reactor nuclear power plant, it was indicated that computing type pH analysis meter was able to satisfy the position of chemical supervision in pressurized water reactor nuclear power plant. The application situation and application future of pH analysis meter in pressurized water reactor nuclear power plant was summarized.
    Coalfired power plant in Vietnam soft clay layer foundation pretreatment plant and construction study
    HUANG Chengbin, ZHOU Zhengyi, LI Jinfeng
    2017, 39(9):  42-44. 
    Asbtract ( 340 )   PDF (848KB) ( 957 )  
    Related Articles | Metrics
    The site of a power plant in Vietnam was selected on southwestern coastal alluvial plain, based on the geological exploration report, there was 10.75 to 22.00m clay and silt clay exists in site shallow subgrade. This layer of clay is widespread, low intensity and high deformation, which seriously threatened the structural safety of power plant. During the construction plan discussion phase, soft clay foundation pretreatment plan was discussed based on the different bearing capacity requirements and different construction progress. This paper introduced the pretreatment plan and its discussion progress. Which could be referred for similar problem.
    Reason analysis and restoring treatments of face destruction for a certain concrete face rockfill dam
    XU Zenghui1, ZHANG Chenliang2, WU Jicai2
    2017, 39(9):  45-47. 
    Asbtract ( 299 )   PDF (906KB) ( 1256 )  
    Related Articles | Metrics
    In the first phase construction process of a certain hydropower station, structural damage and cracks appeared on the face. In this paper, the face destruction was checked and the damage reasons were analyzed firstly. After that, some face restoring treatments were proposed according to the stress features of concrete face and local actual conditions. After the restoring, the deformation of concrete face became stable and the leakage was controlled within the permissible range. At last, this paper summarized the problems that need attention in face restoring process and provided a reference for similar construction project of concrete face rockfill dam.
    Study on post evaluation system of power transmission and transformation project considering the new situation of power reform
    JIN Bowen, WANG Guangzeng
    2017, 39(9):  48-51. 
    Asbtract ( 213 )   PDF (798KB) ( 616 )  
    Related Articles | Metrics
    For the problems of no unified post evaluation system of China’s power transmission and transformation project was established and no new requirement of power reform was reflected, this paper conducted a thorough study on post evaluation system of power transmission and transformation project considering the new situation of power reform. Firstly, it analyzed the influences of power reform on the post evaluation system of power transmission and transformation project and extracted post evaluation indexes that adapted to power reform. Secondly, combining the provisions of State Grid on post evaluation of fixed asset investment projects,it proposed a comprehensive post evaluation method of power transmission and transformation project based on post evaluation indexes, which were selected from the aspects of preliminary work, preparation stage evaluation and procedure evaluation etc. Lastly, the effectiveness of the study were verified by instance analysis.
    Technoeconomic analysis of 350MW heating unit that using ultrasupercritical parameters
    HAO Yunyan
    2017, 39(9):  52-53. 
    Asbtract ( 245 )   PDF (733KB) ( 856 )  
    Related Articles | Metrics
    The 350MW supercritical steam turbine is the main type for domestic large heating unit at present, and there is a constant dispute whether its economy could be improved by increasing steam parameters to ultrasupercritical parameters. Combining the analysis conclusions of turbine plants, this paper analyzed the technical feasibility of 350MW heating unit using ultrasupercritical parameters, the rationality of initial parameters selection and the economy of equipment investment and operation cost. And provided a reference for the reasonable ultrasupercritical parameters selection of 350MW unit.
    Domestic 600MW supercritical coalfired unit variable load denitration reconstruction technology analysis
    SHI Zhongxi, ZHANG Jinzhu
    2017, 39(9):  54-57. 
    Asbtract ( 265 )   PDF (729KB) ( 674 )  
    Related Articles | Metrics
    With the economic growth of China slowed down, the total generation capacity and thermal power unit utilization rate is lowered year by year. The load of thermal power generation units maintains low level for constantly, and frequently start and stop. Due to the operating condition and environmental requirements, power plant variable load denitration is imperative. By analyzing and comparing kinds of 600MW supercritical coalfired unit variable denitration technical approaches, the most suitable approach for coalfired unit was recommended.
    Thermal power plant waste water zeroemission technology proposal
    LIU Jin
    2017, 39(9):  58-62. 
    Asbtract ( 627 )   PDF (881KB) ( 2052 )  
    Related Articles | Metrics
    To realize thermal power plant waste water zero emission, technology of desulfurization waste water preprocess, desulfurization waste water concentrated treatment and tail strong brine evaporative crystallization was compared. The propitiated proposal was selected. Postprocessed condensate water could be used as industrial water, and realized power plant water treatment system closetype circulating. There is not any water discharged. Waste water zero emission was realized.
    Civil sludge incineration disposal flue gas cleaning process study
    ZHANG Hui, KONG Hua
    2017, 39(9):  63-66. 
    Asbtract ( 200 )   PDF (788KB) ( 547 )  
    Related Articles | Metrics
    The component of civil sludge is complicated. Besides moisture, large quantity of pathogenic bacteria, parasite, pathogenic microorganism, and arsenic, copper, chrome, mercury, and other toxic matter exist in civil sludge. Casually disposing untreated sludge will cause new pollution and waste resources. Harmfree treatment of civil sludge has been already a critical environmental project for each level government and administration. By analyzing the component of civil sludge, and studying on incineration disposal, a recommended proposal was provided.
    Coalfired power plant flue gas denitration catalyst harmfree treatment and reuse technology study
    WANG Lele, YAO Yan, WANG Lipeng, YANG Xiaoning, HE Chuan, KONG Fanhai
    2017, 39(9):  67-70. 
    Asbtract ( 245 )   PDF (943KB) ( 1124 )  
    Related Articles | Metrics
    With the popularization  in our country, generation of flue gas denitration catalyst as solid hazard is increasing year by year. Treatment of this became a critical problem. By analyzing the generation and harmness of flue gas denitration catalyst, the treatment principle of decreasing, harmfree and resourcing was indicated. Based on this principle, this paper introduced and compared technical approaches to treat the waste catalyst after analyzation. The introduction and discussion of relevant technology could be referred for following study.
    Different viewpoint of CO2 and global warming
    LI Changhao, YAN Lu, ZHOU Zhengyi
    2017, 39(9):  71-72. 
    Asbtract ( 321 )   PDF (839KB) ( 1156 )  
    Related Articles | Metrics
    Since the first climate change assessment report publicized by Intergovernmental Panel on Climate Change (IPCC), whether CO2 is the main factor caused global warm became a controversy topic in academe. This paper introduced the viewpoint of Nongovernmental International Panel on Climate Change (NIPCC). They claimed that the global climate models (GCMs), built by IPCC, have defects, effect of CO2 was overestimated. And IPCC ignored radiative forcing, back donation and other factors. NIPCC believe global warming is caused by natural reasons, not human activates.
    Realtime monitoring system based denitration operation improvement management
    XU Jinsong, SHAO Yuan
    2017, 39(9):  73-75. 
    Asbtract ( 231 )   PDF (938KB) ( 475 )  
    Related Articles | Metrics
    Based on the operation data, including selective catalyst reduction (SCR) system inlet NOx mass density, oxygen content, denitration efficiency, flue gas flow rate, ammonia injection rate and others, monitored by realtime mornitoring system, a few of calculation models were built to verify denitration operation and set alarm value. Establishment of denitration alarm system will help power plant to adjust in time.