    25 March 2013, Volume 35 Issue 3
    专题综述
    Problems existing in debugging of condensed water fine treatment system and handling measures
    YANG Tao;WU Peiying;XUE Changgang;L Zhigao
    2013, 35(3):  1-2. 
    Asbtract ( 635 )  
    Related Articles | Metrics

    In debugging process of the condensed water fine treatment system of 2×600MW unit in Guohua Mengjin Power Generation Company Limited, some problems occurred, which include that the pressure difference of the resin trapper was higher, the regeneration effect was poor, the interlock protection was not designed and so on. Aiming at these problems, a practical and feasible solution was proposed, and the safe and stable operation of entire system was ensured.

    Application of domestic resin in condensed water fine treatment substituting for import resin
    CUI Shaobo;SUN Wei
    2013, 35(3):  3-4. 
    Asbtract ( 587 )  
    Related Articles | Metrics

    The feasibility of using the domestic resins D003NJ and D203NJ in condensed water fine treatment to substitute for import resins with the same performance was introduced. The application of these domestic resins in two 600MW subcritical units of Huadian International Zouxian Power Plant shows that to replace the abroad resins by domestic same products is feasible completely.

    Analysis on operation control mode of condensate pump of 1 000 MW unit
    XING Lijun;MA Yongsheng
    2013, 35(3):  5-7. 
    Asbtract ( 564 )  
    Related Articles | Metrics
    In normal operation of the 1000MW unit, the operation mode of the condensate pumps is that two pumps are put into operation, and one pump is standby. The two operating pumps are controlled by variable frequency control technology, and the standby pump is driven by 50Hz power source. Along with increase of the unit peak shaving depth, the variation range of the unit load also increases. After the condensate pump was controlled by variable frequency control technology, it is very important to keep the condensate pump outlet mainpipeline pressure and the water level of the deaerator to be stable in normal operation. A solution of the operation and control mode of the condensate pump of 1000MW unit was proposed.
    Analysis on operation of condensate polishing system without condensate makeup water tank
    LIN Fuhai
    2013, 35(3):  8-8. 
    Asbtract ( 695 )  
    Related Articles | Metrics
    Taking the condensate polishing system without condensate makeup water tank of a power plant as example, the operational aspects of the condensate polishing system in processes of startup and normal operation of the unit were analyzed. Some concrete treatment measures were given, which can be used as reference for other units operating in similar mode.
    Optimization of variable frequency control strategy for condensate pump
    XIAO Chengming
    2013, 35(3):  9-10. 
    Asbtract ( 603 )  
    Related Articles | Metrics

    In the condensate system, in order to reduce the throttle loss of the deaerator water level control valve and reduce the power consumption rate of the condensate pump, by means of test and grope, the variable frequency operation mode of the condensate pump was optimized. When the unit operates normally, the condensate pump converter can be put into operation automatically, the safe and stable operation of the unit under various conditions was ensured, and the power consumption rate of the condensate system was reduced further.

    研究与开发
    Analysis on reasons of higher energy consumption of draft fans for power plant boiler and energysaving reformation scheme
    DONG Kun;XIE Jianwen;ZHOU Keyi
    2013, 35(3):  11-15. 
    Asbtract ( 845 )  
    Related Articles | Metrics
    The operation parameters and the economical efficiency of the draft fans for boilers of five power plants (five units) were analyzed, and the energy consumption rate of the fans under different conditions was obtained. According to analysis on the fan efficiency, the resistance characteristics of the fan pipeline and the adjustment mode of the fans, the basic reason of higher energy consumption of the fans in practical operation was found, and the main reformation way of the fans for the five power plants (5units) was put forward.
    Calculation and analysis of vacuum base value of thermal power unit for energyloss analysis
    HAN Qin;XU Xiaobin;CHANG Hao
    2013, 35(3):  16-19. 
    Asbtract ( 843 )  
    Related Articles | Metrics
    In energyloss analysis of thermal power units, the vacuum base value usually obtained by fitting the curve of condenser characteristics provided by the condenser manufacturer, and this is suitable for special condition only, in which the cooling water flow, the condenser steam flow, the cooling water flow velocity, the cooling water temperature at the inlet and other parameters are all in the range of designed value. Taking the 150MW unit of Inner Mongolia Huadian Wuda Thermal Power Company Limited as example, the vacuum base values obtained by three calculation methods were analyzed and compared. The result shows that according to the base value obtained by fitting the manufacturerprovided condenser characteristics curve, it is can not calculate the condenser pressure base value, and the calculated value obtained under variable working condition of the condenser should be taken as the vacuum base value.
    Design features of gassteam combined cycle heat and power cogeneration unit
    HAO Xiangjun
    2013, 35(3):  20-21. 
    Asbtract ( 673 )  
    Related Articles | Metrics
    The design features of the flue gas system, the main steam and its bypass system, the heat supply system, the condensate water system, the auxiliary steam system and the vacuumpumping system of the Fclass “two on one” multishaft gassteam combined cycle heat and power cogeneration unit, which is first coal bed gasfired unit in China, were expounded in detail. The result in this paper can be used as reference for the system design of similar units.
    Influence of tempering temperature on structure properties of P92 steel
    ZHANG Fengshou;YUN Feng;SONG Guoying;CHEN Chunhui;LI Junfeng
    2013, 35(3):  22-25. 
    Asbtract ( 604 )  
    Related Articles | Metrics
    After T92 steel was tempered at different tempering temperature and by different cooling methods, the variations of properties of T92 steel, such as the microstructure, the hardness and the mechanical properties, were detected. The influence of the tempering treatment on the characteristics of P92 steel was researched. The experiment results show that after high temperature tempering (830℃), the microstructure of the T92 steel changed from martensite into ferrite and carbide gradually, the tensile strength and the shock absorbing energy of the steel did not reduce, but the hardness and the yield strength of the steel reduced obviously (lower than the lower limit value required by relevant standard). On the side, in high temperature tempering process below AC1 line, the cooling speed does not much impact the properties and the microstructure of the material.
    Comparing analysis on computing methods of electrical safety clear distance
    LI Jing;CHANG Afei
    2013, 35(3):  26-28. 
    Asbtract ( 514 )  
    Related Articles | Metrics
    In the electrical design, the selection of the electrical safety clear distance has important impact on the reliability of electrical operation and the safety of working personnel. In the file DL/T 5352—2006“Technical Code for Designing High Voltage Electrical Switchgear”, only the safety clear distances for several conventional voltage classes were given. When the designed voltage is changed, it is unable to select the safety clear distance from the technical code directly. According to the comparison of the domestic standard with the international standards, the relation between the minimum electrical clear distance and the minimum safety distance was discussed, and the computing method of electrical safety clear distance was obtained.
    SOC estimation and equalizing charge method for LiFePO4 Liion battery pack in substation
    WANG Xiaodong;SHI Yifeng;KAN Jianfei
    2013, 35(3):  29-31. 
    Asbtract ( 751 )  
    Related Articles | Metrics
    The features of the operation environment of LiFePO4 Liion battery pack in the DC system of substation were analyzed. The estimation method of SOC of LiFePO4 Liion battery pack in different working phases was given, and the relevant method of equalizing charge for the battery pack was given too.
    Detection method of output current effective value of highvoltage cascade frequency converter
    DING Mingjin;SUN Gongwei;YU Zhifei;ZHANG Ying;MU Tianzhu
    2013, 35(3):  32-34. 
    Asbtract ( 606 )  
    Related Articles | Metrics
    In recent years, the universal type highvoltage cascade frequency converter became key device for energy conservation due to its structural advantages. The output current of the converter is the key variable for overload protection, overcurrent protection and V/F control compensation, so it is very necessary to measure the realtime current effective value accurately. The fast true RMS method using 1/6 period wave was used to calculate the effective value of the current signal. Then the fitting method was used to obtain the practical output current of the converter. The algorithm is one of true RMS algorithms and suitable for detection of current signal containing harmonics; and in this method, the repeated mean value filtering necessary for other methods is avoided, so the calculation time is reduced. By this method, the control system of the converter can provide more accurate reference for the overload protection circuit, and the misoperation rate of the system is decreased, which provides possibility to set more accurate safety margin for the equipment and to ensure safe operation of the equipment.
    技术交流
    Analysis on limitation of deterministic dynamic programming method in solving problem of power generation optimization of cascade hydropower plants
    LIU Shulin;XIAO Yan
    2013, 35(3):  35-37. 
    Asbtract ( 603 )  
    Related Articles | Metrics
    The deterministic dynamic programming method is often used in domestic production practice to solve the problem of optimized dispatch of cascade hydropower plants. The problems of the deterministic dynamic programming method in solving cascade power generation optimized dispatch caused by the limitation of the method itself were analyzed. The deterministic dynamic programming method is of certain guiding significance for seeking cascade medium and long term power generation optimal dispatch strategy and the power generation plan analysis, however, it is not suitable to solve the problem of shortterm power generation dispatch optimization.
    Reformation of dual channel communication mode of Wuxijiang water regimen measuring and reporting system
    WANG Shuxiang
    2013, 35(3):  38-42. 
    Asbtract ( 527 )  
    Related Articles | Metrics

    In order to solve the problem of single communication mode of the Wuxijiang water regimen measuring and reporting system and to make the system to conform to the specification, the short message channel was constructed additionally in the system, and the system dual channel communication mode was realized. The construction configuration, the operation, the advantages and disadvantages, the obtained results and existing problems of the system dual channel were analyzed, and some suggestions were put forward. After reformation, the stability and the reliability of operation of the water regimen measuring and reporting system were improved, which provides a guarantee for improving the flood forecasting accuracy and leading function for economic operation of the hydropower plant and the flood control and drought relief, and the requirements of flood control and scientific dispatching of the reservoir were satisfied preferably.

    技术交流
    Analysis on fault of HP type mediumspeed mill and countermeasures
    FAN Wenbin
    2013, 35(3):  43-44. 
    Asbtract ( 618 )  
    Related Articles | Metrics
    The structure of HP type mediumspeed mill was introduced. The defects of HP type mediumspeed mill in operation, such as the serious wear of the scraper, the coal contained in discharged gravels, the decreased oil viscosity in lubricatingoil station, the jamming of slag discharging pneumatic gate, the air leakage in primary hot air regulating gate, the larger dust concentration during slag discharging, the falling off fault of the wearresisting scaleboard and others, were analyzed. The feasible preventive measures were formulated; the defects of the equipment were eradicated completely, and the operation reliability of the mill was enhanced.
    Analysis on reason of 600MW generator stator grounding fault through single point and treatment
    ZHANG Jianzhong;ZHANG Zhimeng;YUE Xiaoming;LIU Hui;ZHANG Binghai
    2013, 35(3):  45-47. 
    Asbtract ( 667 )  
    Related Articles | Metrics
    A 600MW generator tripped accident caused by tripping of the stator grounding protection device was introduced. The reasons of the accident were analyzed. The fault search method was introduced, and the suggestions for preventing similar accidents were put forward.
    Characteristics of frequency converter for coolant pump of AP1000 nuclear power plant and optimization of power supply circuit
    XIAO Hui
    2013, 35(3):  48-51. 
    Asbtract ( 633 )  
    Related Articles | Metrics
    The equipment parameters and the practical operation condition of the coolant pump of domestic AP1000 nuclear reactor request higher performance of the coolant pump frequency converter. The characteristics and performance of the coolant pump frequency converter for AP1000 nuclear power plant were expounded from three aspects, which are the structure of the device, the control and protection mode and the operation features of the coolant pump converter. The optimization measures for the power supply circuit of the coolant pump were put forward, which can increase the reliability of the power supply for the motor of the coolant pump.
    Analysis on problem of field signal interference and solving method
    LUO Peijun
    2013, 35(3):  52-54. 
    Asbtract ( 653 )  
    Related Articles | Metrics
    The main reasons of signal interference were analyzed. Several examples of field signal interference treatment were enumerated. Some frequentlyused solving methods were expounded.
    Improved scheme of water feeding using turbofeed pump instead of electrically driven feed pump
    ZENG Qi;LI Qiang;XUE Peng
    2013, 35(3):  55-56. 
    Asbtract ( 613 )  
    Related Articles | Metrics
    For the startup and shutdown process of turbine No.1 and No.2 in Urumqi Thermal Power Plant of Huadian Xinjiang Power Generation Company Limited, the electrically driven feed pump was adopted for boiler water feeding, its feed ability is 30% rated capacity of the boiler. When the units load reached 100MW, the unit load up had to be stopped for rolling the turbofeed pump, this would not only delay the units load up, but also increase the house service consumption rate. Application of an improved scheme, in which the turbofeed pump rolled by a standby steam source is used to feed the boiler instead of the electrically driven feed pump, solved the problem of load up limitation and saved the house service consumption rate, favorable economical benefits have been obtained.
    Analysis on reasons of steam turbine trip caused by generator reverse power and treatment
    WU Qing;ZHU Xuecun;ZHAO Yisheng;ZHANG Yong;CHEN Lijie
    2013, 35(3):  57-61. 
    Asbtract ( 1588 )  
    Related Articles | Metrics
    In the unit of a power plant, the grid connecting signal of DEH system for the generator had disappeared. The target value of the DEH system could not set normally. Under the speed control mode, the opening of the turbine speed governing valve had been decreased gradually; and this had caused the generator reverse power protection to trip, and a splitting accident of the generator from the system had occurred. The reasons of this outage accident were analyzed, and the measures for prevention of similar accidents were put forward.
    Technology reformation and operation optimization of reclaimed water treatment system in Urumqi Thermal Power Plant
    WANG Yi;ZHANG Tao
    2013, 35(3):  62-63. 
    Asbtract ( 599 )  
    Related Articles | Metrics
    (Urumqi Thermal Power Plant of Huadian Xinjiang Power Generation Company Limited, Urumqi 830017, China)
    Taking the Urumqi Thermal Power Plant of Huadian Xinjiang Power Generation Company Limited as example, the problems existing in operation of the reclaimed water treatment system were analyzed. Some targeted measures of technology reformation and operation optimization were proposed. After the measures were implemented, good effects were obtained, which provides reference for solving similar problems.
    节能与环保
    Analysis on reformation scheme of desulphurization system eliminating flue gas bypass
    XU Bin;XIN Shouliang;LI Jiyuan;GU Wensheng
    2013, 35(3):  64-67. 
    Asbtract ( 629 )  
    Related Articles | Metrics
    The functions of the flue gas bypass system were introduced. The factors influencing on the reliability of the desulphurization system without flue gas bypass system were described. Some targeted improvement measures were adopted, and good effects were obtained.
    Analysis on reasons of blind zone of limestone in wet desulphurization system of 600 MW unit
    LV Xuedong;SHEN Jianjun
    2013, 35(3):  68-69. 
    Asbtract ( 631 )  
    Related Articles | Metrics
    The limestone blind zone, which occurred in Inner Mongolia Huadian Baotou Power Generation Company Limited, was studied in depth. The features and the formation mechanism of limestone blind zone were analyzed and described. The relevant treatment methods and preventive measures were put forward, which can be used as reference for related technical staff.
    Electrical system design for flue gas desulphurization system without bypass of thermal power plant
    XIN Shouliang
    2013, 35(3):  70-73. 
    Asbtract ( 632 )  
    Related Articles | Metrics
    The flue gas desulphurization equipment without bypass of thermal power plant operates simultaneously with the main power generation unit, and the desulphurization electrical system is identical in importance with the electrical system in the main power house. The conventional desulphurization electrical system for FGD system with bypass is difficult to satisfy the requirement in reliability and continuity of the power supply. The design of electrical system for FGD system without bypass was expounded in detail, and the design features of the desulphurization electrical systems for the system with bypass and the system without bypass were compared, which provides reference for the persons of the same profession.
    新能源
    Regression calculation of physical property data of heat transfer oil in solar power station
    LIU Changcai;ZHAO Liqiong;XU Qing
    2013, 35(3):  74-76. 
    Asbtract ( 561 )  
    Related Articles | Metrics
    According to analysis of physical property of heat transfer oil sample data, using method of mathematical model, the parameters of the physical property were calculated by regression algorithm, and in range of set allowed variance, the parameters of the mathematical model were obtained. The calculation result was compared with the physical property calculation result in original database, and the comparison shows that to adopt the physical parameters based on the sample data regression can improve the calculation precision and perfect the engineering design.