Loading...
RSS
Toggle navigation
Home
About Journal
Editorial Board
Editorial Board
Youth Editorial Board
Publication Ethics
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles
Subscription
Advertisement
Contact Us
中文
Table of Content
25 February 2011, Volume 33 Issue 2
Previous Issue
Next Issue
专题综述
研究与开发
技术交流
节能与环保
专题综述
Analysis on fracture reasons of last fourstage blade of steam turbine and treatment
DUAN Jipeng
2011, 33(2): 1-3.
Asbtract
(
1529
)
Related Articles
|
Metrics
The fracture accident of last fourstage blade of the steam turbine in Xinjiang Baicheng Power Plant was occurred again.The reasons of blade fracture were analyzed. The online replacing technology of last fourstage blade with pinned root and concrete requirements were introduced. After the blades were replaced online, the unit operates normally; and the actual effect of the blade replacing technology was obtained.
Application of DAS gland seal in reformation of 600MW steam turbine
LIU Junling;;LI Yongjun;ZHAO Tieying
2011, 33(2): 4-5.
Asbtract
(
1267
)
Related Articles
|
Metrics
The reason and purpose of the gland seal reformation of a 600MW unit in Hebi Fenghe Power Generation Company Limited were analyzed. The theory and functions of DAS gland seal and the comparison with other type gland seals were introduced. The improvement of the unit in vibration and heat consumption rate after reformation were compared with those before reformation, and the evaluation of the reformation effects of DAS gland seal was obtained.
Analysis on reasons of bearing vibration of 330MW steam turbine in changeover from single valve mode into sequence valve mode
ZENG Qi
2011, 33(2): 6-7.
Asbtract
(
1317
)
Related Articles
|
Metrics
In Urumqi Thermal Power Plant of Huadian Xinjiang Power Generation Corporation Limited, after the operation mode of steam turbine No.1 was changed over from single valve mode into sequence valve mode, the bearing vibration of turbine No.1 in X,Y direction increased to about 200μm, which has a strong impact on unit safety; so the turbine operation mode had to be changed over into single valve mode again. The single valve operation mode causes larger cutoff loss, and the steam rate of the unit will increase, the economical efficiency of the unit will reduce. The open sequence of single valve mode and sequence valve mode was regulated, the unit vibration had been controlled less than 70μm, and the desired effects were obtained.
研究与开发
Analysis on engineering project of water intake and outlet layout for coastal nuclear power plant
ZHOU Jinquan
2011, 33(2): 8-14.
Asbtract
(
1342
)
Related Articles
|
Metrics
In the design of water intake and drainage engineering for coastal nuclear power plants, the influence of multiple aspects, such as the coast stability, the variation of sediment flushing on the seabed, the tide level, the wave, the sediment and the sea creatures in the sea area near the plant, must be considered. Through the engineering project analysis, the optimized scheme between the hydraulic engineering allocation, the structure and the heat dissipation capacity was put forward, and the key points in design of the water intake and drainage project were given. It was pointed out finally that for the water intake and drainage project of coastal nuclear power plant, the engineering scheme must be determined on the base of the technical and economical comparison and argumentation of several schemes, the hydraulic numerical simulation calculation and the physical model experiment.
Induced draft fan type selection for 2×600MW unit of Tongzi Power Plant
WANG Jie
2011, 33(2): 15-17.
Asbtract
(
1401
)
Related Articles
|
Metrics
The feasibility of merging the induced draft fan and the booster fan for desulphurization in 2×600MW unit of Guizhou Huadian Tongzi Power Generation Corporation Limited was analyzed. The fan type selection schemes for merging mode and the two fans separately configuring mode were put forward. The initial costs and the costs of operation and maintenance of the two modes were compared. The type selection of merged fan and the configuring number of induced draft fan were demonstrated. The scheme of merging the induced draft fan and the boost fan for desulphurization was recommended in this project, and the axial fan with adjustable rotor blade was recommended for the merged fan.
Optimization of capacity increasing reformation scheme for desulphurization system of large thermal power generation unit
WANG Yong;WANG Zhidong;PEI Junyuan
2011, 33(2): 18-19.
Asbtract
(
1376
)
Related Articles
|
Metrics
The poor quality and varied grades of asfired coal may cause the mass fraction of the sulfur to be much higher than the designed value, which will lead to the desulphurization equipments irregular operating and even to be damaged. In order to raise the adaptability of the desulphurization system for various coal grades, and satisfy the emission requirement of relevant standard when the highsulfur coal is fired, the capacity increasing reformation of the desulphurization system is necessary. The selection and optimization of the reformation technique scheme for the desulphurization system in Huadian Xinxiang Power Generation Corporation Limited were introduced, and the operation effects and the efficiency of the system after reformation were analyzed.
Analysis on electric field of wall bushing for 40.5kV switch cabinet and optimized design
WANG Wenfeng;ZHANG Qingjie;JIANG Liqi
2011, 33(2): 20-21.
Asbtract
(
1144
)
Related Articles
|
Metrics
Aiming at the aging of partial insulation and partial discharge of wall bushing for switch cabinet bus, using the finite element analysis software Ansys, the partial electric field distribution was simulated and analyzed. The two structure optimization schemes were put forward, one of them is to increase the inner diameter of the insulation bushing properly, and the other is to reform the rectangular section of the bus into round corner shape. The simulation result shows that the optimized schemes can improve the electric field distribution in the air gap between the bus and the wall bushing and decrease the partial insulation aging of the wall bushing effectively.
技术交流
Technical reformation of the final reheater of a boiler
LIU Ligang;GUO Jingling;YAN Changyou
2011, 33(2): 22-23.
Asbtract
(
1223
)
Related Articles
|
Metrics
The crack and leakage problems of the ‘four pipes’ of boiler No.3 in Heilongjiang Huadian Fulaerji Power Generation Company Limited were analyzed technically. The pipeline design was optimized, and the relevant technical reformation was implemented. The reheater operates safely and reliably.
Reasons analysis and preventive measures on larger opening of normal drainage regulating valve of highpressure heater
BI Yuheng;L Pengfei;NI Guodong
2011, 33(2): 24-26.
Asbtract
(
1953
)
Related Articles
|
Metrics
The reasons of larger opening of normal drainage regulating valve of highpressure heater No.1 in 600MW supercritical unit in a power plant were analyzed; and the solving methods and the preventive measures were put forward, which can be used as reference for the highpressure heater operation of other power plants.
Application of highvoltage variablefrequency speed control device in condensate pump
WU Baohua;LIU Hui
2011, 33(2): 27-29.
Asbtract
(
1174
)
Related Articles
|
Metrics
The energysaving theory of variablefrequency speed control device was introduced. Combining with the design parameters and operation conditions of the condensate pump of unit No.1 in SDIC Qujing Power Generation Company Limited, the variablefrequency reformation scheme for the condensate pump was put forward. The comprehensive economical benefit of the reformation of condensate pump was analyzed, and better effects were obtained.
Reformation and optimized operation of speed control system of boiler feed pump turbine
ZHAO Yuzhu;WANG Zhangsheng;XU Houda
2011, 33(2): 30-32.
Asbtract
(
1229
)
Related Articles
|
Metrics
The particular case of the micro electro hydraulic control system (MEH) reformation of the boiler feed pump turbine and the fault of difficulty in latchon occurred in operation after the reformation were introduced. According to the experimental analysis, the reasons of the MEH system fault were found out, and the optimizing measures were given, the problems in MEH reformation were solved.
Application of the three point method for dynamic balance to pulverized coal exhauster
WANG Qingdong
2011, 33(2): 33-34.
Asbtract
(
1540
)
Related Articles
|
Metrics
The abrasion of the vane wheel of pulverized coal exhauster in Shandong Bainian Electric Power Development Corporation Limited was not uniform, which caused the larger vibration of the bearing pedestal. The procedure of threepoint method for dynamic balance was introduced. After the balance weight block was added in accordance with the calculation, the vibration of the bearing pedestal was reduced to acceptable value, and which is helpful for safe operation of the pulverized coal exhauster.
Analysis on fault of steam drum water level indicator in initial startup stage and prevention
GU Baoquan
2011, 33(2): 35-36.
Asbtract
(
1477
)
Related Articles
|
Metrics
Taking several kinds of steam drum water level indicator frequently used in Heilongjiang Huadian Fulaerji Power Generation Company Limited as the examples, the working theory of the steam drum water level indicators and their common faults in different conditions were analyzed. Combining with the serious consequences caused by abnormal operation of steam drum water level indicator in boiler startup stage, the reasons of its faults were analyzed; the important significance of executing related regulations was expounded; and the preventive measures for enhancing the technical management and institution management were put forward.
Analysis and treatment on a unit tripout accident caused by tripping of generator ground protection
ZHANG Xiaobing
2011, 33(2): 37-37.
Asbtract
(
1997
)
Related Articles
|
Metrics
The reasons of a unit tripout accident caused by abnormal melt of the fuse in PT primary side in the generator outlet were analyzed. The defections in the selection of PT primary fuse and in the voltage sampling mode of the protection device were pointed out; the improvement and preventive measures were put forward.
Analysis on reasons of abnormal oil dielectric dissipation factor and the treatments
WANG Hongming;LI Qingchang;SUN Chengjun
2011, 33(2): 38-40.
Asbtract
(
1130
)
Related Articles
|
Metrics
The measurement value of the oil dielectric dissipation factor of the Huadian International Zouxian Power Plant has larger dispersibility, and electric discharge phenomena occurred in the measurement. According to the analysis of the collected data, it was determined that the reason of the larger variation of the measured value is the fault in the 2801 type electrical bridge. After the lead column joint of the oil cup of 2801 type electrical bridge was replaced, the measured data of the oil dielectric factor became stable, and the internal electric discharge was solved effectively.
Application of coal blending technology in thermal power plant
XUE Tiezhu;HU Linmao
2011, 33(2): 41-43.
Asbtract
(
1144
)
Related Articles
|
Metrics
The theoretical foundation of the coal blending, the common blending modes, the ensuring measures and the requirements of the coal blending were introduced. Aiming at the coal blending scheme for the thermal power plant, some optimization suggestions were put forward, providing reference for coal blending in thermal power plant.
Analysis on shortcircuit fault and opencircuit fault of electrostatic precipitator in noload voltage rising test
BO Zunjun
2011, 33(2): 44-45.
Asbtract
(
1740
)
Related Articles
|
Metrics
The working theory of the electrostatic precipitator was introduced; based on this, various common kinds of shortcircuit fault and opencircuit fault in noload voltage rising test of the precipitator were expounded. The voltage of the electrostatic precipitator could not rise up to rated voltage due to these faults. The reasons of shortcircuit fault and opencircuit fault were analyzed; the relevant measures were adopted; so the faults were eliminated.
The application of the separated circuit in equipments with uninterruptible power supply
GUO Bochun
2011, 33(2): 46-48.
Asbtract
(
1323
)
Related Articles
|
Metrics
The current automatic power supply changeover switch and the redundant standby mode of important equipment were expounded, and their deficiencies in the security and the reliability of the equipments were pointed out. The way to optimize and perfect the circuit design using the separated circuit was put forward, and the security and the reliability of equipments in longterm operation were enhanced by this way.
Characteristics of fuel control system of 600MW supercritical boiler and optimizationQU Qijiu
QU Qijiu
2011, 33(2): 49-52.
Asbtract
(
1044
)
Related Articles
|
Metrics
The directfired pulverizing system adopted in a 600MW supercritical unit has larger delay time and inertia. Depending on the quantitative measurement of coal feed rate, the compensating system and the cascade control system, the requirements of boiler operation were satisfied. The problems occurred in operation process were analyzed; some effective measures were adopted, and the operation stability was ensured.
Application of threepoint method for dynamic balancing in largescale fan
FAN Wenbin
2011, 33(2): 53-54.
Asbtract
(
1552
)
Related Articles
|
Metrics
The threepoint method is a relatively practical dynamic balancing method for fans. In this method, an identical trial mass will be located in proper sequence on three positions,the angles between two of them are all 120°,for measuring the three vibration values, then the drawing diagram by using the CAD software. The result of the threepoint method can get perfect effect in the site conditions, the calculation and the diagram are accurate, and the vibration amplitude will be reduced less than 0.05mm by using this method.
Analysis of abnormal situation of rotor magnetic pole in 50MW hydroelectric generator
CHAI Fangguang;CHENG Zhenwei
2011, 33(2): 55-57.
Asbtract
(
1424
)
Related Articles
|
Metrics
In the overhaul test of rotor of hydroelectric generator No.2 in Hunanzhen Hydropower Station, it was found that the alternating impedance of the magnetic pole was decreased and the power loss was increased. The left and right outlet terminals of pole No.9, the impedance voltage of which was decreased in largest scale, were unfastened, then relevant test was carried out, and the reasons of abnormal situation of the pole were analyzed. One of the reasons is metallic interturn shortcircuit in the pole coil. In addition, the dirt in the pole, in which metal particles were contained, should cause local short magnetic circuit of iron core. It is pointed out that the influence of the indirect short circuit of rotor magnetic circuit on the test data should be considered in test.
Analysis on reasons of electronic weighing coal feeder blockage
LIAN Yinghua
2011, 33(2): 58-59.
Asbtract
(
1868
)
Related Articles
|
Metrics
Due to coal jamming, the coal feeder of the Fujian Huadian Kemen Power Generation Corporation Limited had been coerced to shut down repeatedly to clean the coal. It was found by analysis that the reason of the coal feeder blockage is the higher humidity of the asfired coal. The data of the blockage in inlet tube and outlet tube of the coal feeder were compared, and some suggestions on operation were given to ensure the boiler to operate safely and stably.
Application of newtype gland seal in domestic 600MW unit and economic efficiency analysis
FENG Renhai;YU Qiyun
2011, 33(2): 60-61.
Asbtract
(
1254
)
Related Articles
|
Metrics
In order to reduce steam leakage loss and increase unit safety and economic efficiency, it is necessary to reform the traditional gland seal using advanced steam sealing technology. The application of the Brandon steam seal on N60016.67/538/538 steam turbine was introduced. The system pipeline was optimized. By comparison of the thermodynamic test result before reformation with that after reformation, it was found that adopting the Brandon steam seal can reduce the heat rate of turbine considerably and enhance the operation economic efficiency of the turbine.
Perfection of furnace safety supervision system
LI Xinjian
2011, 33(2): 62-65.
Asbtract
(
1302
)
Related Articles
|
Metrics
The furnace safety supervision system (FSSS) is one of main protection devices of largescale coalfired units. The imperfection of design of FSSS poses a great threat to the unit safe operation. Combining with the features of main and auxiliary equipments and distributed control system of the combustion system of Weifang Power Generation Company Limited, the control logic design, the signal switchover and the design of the MFT hardware connecting circuit were optimized; so the safety and reliability of the boiler operation had been maximized.
节能与环保
Realization of ‘four furnaces with one tower’ in semidry desulphurization project
QIU Gang;JI Chuanjun;MA Hongliang
2011, 33(2): 66-69.
Asbtract
(
1197
)
Related Articles
|
Metrics
The semidry flue gas desulphurization technology with dualcirculating fluidized bed boiler was introduced. Based on this, combining with the practical application example of flue gas suspension desulphurization technology with dualcirculating fluidized bed in the ‘four furnaces with one tower’ flue gas desulphurization system, several key technologies applied in semidry flue gas desulphurization project were expounded.
Treatment of leakage points of bypass flue in wet flue gas desulphurization system under the condition of it′s without sut up gasgas heater
NIE Pengfei;ZHANG Hongyu
2011, 33(2): 70-73.
Asbtract
(
1718
)
Related Articles
|
Metrics
The reasons of leakage of bypass gas flue in the WFGD system without GGH of Hebei Datang International Wangtan Power Generation Company Limited were analyzed. The operation conditions of the bypass gas flue in WFGD system were introduced. According to the requirement of anticorrosion, three anticorrosion schemes were put forward and compared, and an optimal scheme was obtained finally. After the unit had been reformed, the water leakage of the gas flue was eliminated completely.
Management practice of concessionary operation of flue gas desulphurization
XU Huaibin;YANG Lijun;HU Chuntao;LI Yupeng
2011, 33(2): 74-77.
Asbtract
(
1128
)
Related Articles
|
Metrics
Since the desulphurization system of the Inner Mongolia Datang International Tuoketuo Power Generation Company Limited was operated in concessionary mode, by continuous grope and summarizing in practice, the management of the concessionary operation of desulphurization system had been perfected gradually, which ensures safe and stable operation of the desulphurization system. The management manner and the management requirements of the concessionary operation of desulphurization system were introduced, and the advantages and disadvantages of the concessionary operation of desulphurization system were expounded, which provide reference for concessionary operation of desulphurization system of thermal power plant.
Author Center
Online Submission
Citation Format
Copyright Agreement
Template
Author Guidelines
Review Center
Peer Review
Editor Work
Editor-in-Chief
Office Work
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles