    25 July 2018, Volume 40 Issue 7
    Optimization of energy consumption forecast model based on big data platform and parallel random forest
    XIAO Xiangwu, WEN Wen, BAI Quansheng, HU Weidong, LI Zhijin, LIU Keqing
    2018, 40(7):  1-4. 
    Asbtract ( 201 )   PDF (1013KB) ( 1099 )  
    Related Articles | Metrics
    A healthy data set is acquired through data collection and preprocessing based on the construction of distributed big data analysis platform such as Hadoop, Spark and Hbase. Regression forecasting model of energy consumption based on the parallel random forest algorithm is built to comprehensively analyze and compare the relationship between input based on random forest prediction model, model parameters and output. The emphasis lies on comparative analysis of the decision tree number, depth of the decision tree and maximum number of split, which will affect the training model accuracy, running time and complexity. Optimization of the prediction model can achieve accurate prediction on the coal consumption for power supply and soft measurement calculation.
    Research on fault diagnosis technology of supercritical unit based on data fusion
    NI Xinyu1, MAO Dajun2
    2018, 40(7):  5-9. 
    Asbtract ( 152 )   PDF (796KB) ( 660 )  
    Related Articles | Metrics
    Since the supercritical generating system has complex structure and high requirements on safety performance, fault diagnosis is very difficult. Combining fuzzy theory and DS evidential theory, a new fault diagnosis method is proposed, whose process includes membership function determination, fuzzy processing, neural network diagnosis, data fusion with DS evidence theory and obtaining the final result. Taking the fan of a supercritical generating system as an example, this method can be used for fault diagnosis, finding the equipment with higher fault probability quickly and accurately and providing countermeasure according to the fault in time.
    Research and application on calculating method of coal quantity as fire for supercritical unit equipped with doubleinlet and doubleoutlet mill
    XU Weiqiang, LIU Xiang
    2018, 40(7):  10-13. 
    Asbtract ( 179 )   PDF (1185KB) ( 797 )  
    Related Articles | Metrics
    The coal quantity as fire is an important parameter for units equipped with doubleinlet and doubleoutlet mill. Accurate calculation of coal quantity as fire is related to the control and adjustment of the unit. Based on the analysis of the coal mill running mechanism and a large number of field tests, several factors affecting the coal quantity as fire are modified, and various working conditions are considered. A new method for calculating the coal quantity as fire is made, which can control the coal as fire accurately. It solves the great fluctuation of the generators’ parameters caused by large calculating deviation of coal as fire and improve the regulation performance of the unit.
    Numerical simulation studies of parabolic trough solar thermal power generation system
    LI Bo1, YUAN Ye2
    2018, 40(7):  14-17. 
    Asbtract ( 250 )   PDF (931KB) ( 639 )  
    Related Articles | Metrics
    In two regions suitable for the developing solar thermal power stations in western China, numerical simulation with system advisor model (SAM) software and Greenius software is made on a typical 50MW parabolic trough solar thermal power plant. The calculation is carried out mainly on heat storage duration, gross power output per month, annual gross power out, annual utilization hours, photoelectric efficiency, etc. The numerical results indicates that the results of two softwares show similar results and the difference of the results may be caused by the heating field thermal output model and the steam turbine model.
    Exploration and practice of 660MW ultrasupercritical units operating in 620℃ reheating steam
    HAN Rongli, FENG Renhai
    2018, 40(7):  18-21. 
    Asbtract ( 167 )   PDF (1017KB) ( 785 )  
    Related Articles | Metrics
    After the operation of domestic 660MW ultrasupercritical units, it is hard to achieve the designed reheating steam (turbine side) temperature which is 620℃. Analysis, optimization and improvement are made from unit design, engineering quality control and operation optimization, etc. After the commercial operation of units, the reheat steam temperature can be kept at the targeted 620℃ stably in long term. The success of the practice provides a reference for the sametype units in their construction and operation.
    Study and application on flow field optimization of flue gas system at fan outlet in thermal power plant
    LI Dongmin1, ZHANG Zhen2, PANG Shaojian1
    2018, 40(7):  22-24. 
    Asbtract ( 140 )   PDF (1026KB) ( 685 )  
    Related Articles | Metrics
    In order to thoroughly solve the commonly existing problems in traditional rectangular design of flue gas system for induced draft fan outlet in thermal power plant, through the new circular doubletube eccentric confluence technology, a new type of circular flue and new design concept determine the optimized technical solution for flow field of flue gas system at fan outlet. The feasibility and superiority is verified in Huaneng Shantou Power Plant.
    Application and analysis of the leakage monitoring system of Yangliuqing thermo electric boiler
    ZHAO Na
    2018, 40(7):  25-28. 
    Asbtract ( 122 )   PDF (1345KB) ( 754 )  
    Related Articles | Metrics
    It introduces the working principle, system composition and system function of the leakage monitoring system of a boiler tube. The application results show that the leakage monitoring system of boiler tubes play an important role in the timely detection on the minor leakage point of the boiler and the longterm stable operation of the boiler.
    Reform of boiler furnace pressure protection system
    MO Bulin
    2018, 40(7):  29-31. 
    Asbtract ( 151 )   PDF (806KB) ( 872 )  
    Related Articles | Metrics
    In order to solve the problem of blockage and leakage of the measurement pipeline during the operation of boiler furnace pressure protection system, two pressure transmitters were added on the original measurement equipment. One pressure transmitter and one pressure switch shares one sampling device. Signal of transmitter after election is taken as a protection signal. After modification, the blockage or leakage of the furnace pressure measurement pipeline can be monitored online. The furnace pressure measurement equipment can perform online without withdrawing from the furnace negative pressure protection. The pressure switches and pressure transmitters installed in groups can be mutually compared with each other, from which anomalies can be found. The application situation shows that the transformation can greatly reduce the maintenance working intensity of the furnace pressure measurement pipeline, reduce the risk of maloperation caused by maintenance work and make further improvement on the reliability of the furnace negative pressure protection.
    Cause analysis and treatment on vibration of main steam pipe in a power plant
    WANG Xiaofeng1, CHEN Rui2
    2018, 40(7):  32-34. 
    Asbtract ( 305 )  
    Related Articles | Metrics
    Through the stress review, pipeline vibration measurement and analysis on the main steam pipeline in a power plant, the vibration characteristics of the main steam pipeline are obtained. According to the vibration measurement results, a treatment scheme which is installing a damper on the main steam pipeline of max vibration is proposed. It effectively eliminates the pipeline vibration and provides a solid guarantee for the safe and stable operation of the unit.
    Inspection and processing of excessive gas content in transformer oil
    MA Jinping
    2018, 40(7):  35-37. 
    Asbtract ( 291 )   PDF (775KB) ( 1557 )  
    Related Articles | Metrics
    At present, the excessive gas content in the transformer oil are mainly caused by air entry. In the process of excessive gas content in the transformer, scientific and appropriate inspection steps are taken to analysis the reason for excessive gas content accurately, to prevent the new air entry and air residue, and to prevent the equipment damage. It is important to reduce unnecessary operation in the process of processing. It summarizes the useful experience in the process of dealing with the excess gas content of 500kV transformer in Liyuan Power Station, and gives a detailed description of the process and control measures for the inspecting and dealing with the gas content that exceeds the standard in the transformer, which can be used for reference to the treatment process for transformers of the same type.
    Application of 66kV solid electric heat storage device in vigorous peakload regulation of thermal power units
    SUN Liben, ZHANG Shaocheng, XU Bing, SONG Hongfei, ZHENG Lihui, WAN Baige
    2018, 40(7):  38-39. 
    Asbtract ( 236 )   PDF (753KB) ( 807 )  
    Related Articles | Metrics
    In recent years, new energy has developed continuously and rapidly in China. However, the proportion of coalfired thermal power in Liaoning is high. The construction conditions for peakload power supply are poor. It is difficult to adjust the peak during the heating period in winter, and the wind power abandonment is serious. Dandong Jinshan Thermal Power Company Limited built a new 260MW solid electric heat storage device, which converts the abandoned wind power into heat energy and supplies it to the heat network. It can ensure peakload regulation in the winter without reduce the heating output, which realizes the thermoelectric decoupling for thermal power units in winter and increase the utilization ratio of new energy sources.
    Application of rotary air flow clearing technology in the coal bunker unblocking
    ZHANG Shaoxing
    2018, 40(7):  40-42. 
    Asbtract ( 151 )   PDF (767KB) ( 781 )  
    Related Articles | Metrics
    2×670MW coalfired units adopted a directblowing pulverizing system. When the coal quality was poor, the coal bunker was frequently blocked. The original methods which were vibration method, air cannon method, and screw dredge method worked ineffectively. A helical pneumatic dredging device is used to reduce the blockage of the coal bunker dramatically and improve the operation reliability of the system. It also avoids the problem of load reduction caused by coal blockage.
    Selection and analysis on pipe diameter and laying mode of the main pipe in heatsupply network
    ZHENG Zhen
    2018, 40(7):  43-44. 
    Asbtract ( 161 )   PDF (748KB) ( 541 )  
    Related Articles | Metrics
    Taking the heatsupply network project of a thermal power plant for example, on the basis of heatload data analysis, the optimal diameter configuration scheme of the main pipe is selected according to the hydraulic calculation and heat loss estimation of the thermal pipeline. And through the comparison, technologic and economic analyze on 2 schemes which are laying overhead and laying underground, a suitable pipe laying mode is obtained.
    Reconstruction of emergency shutoff valve control loop in gas regulator station of gas turbine power plant
    LI Kun
    2018, 40(7):  45-46. 
    Asbtract ( 175 )   PDF (781KB) ( 971 )  
    Related Articles | Metrics
    When the gassteam combined circle cogeneration unit of Jiangsu Huadian Qishuyan Power Generation Company Limited was conducting a dual power supply switching test on the regulator station control source, the emergency shutdown device (ESD) tripped during the switching process. The power supply to ESD was switched to the output end of static switch, but the ESD still tripped .The reason was that the ESD control loop is not self holding loop. When the control loop is equipped with the self holding loop which delays in return after the power loss, the power supply reliability of the regulator station equipment is ensured and the safety hazard is eliminated.
    Optimization research on condenser rubber ball cleaning technology
    ZONG Xudong
    2018, 40(7):  47-49. 
    Asbtract ( 187 )   PDF (818KB) ( 651 )  
    Related Articles | Metrics
    The condenser end difference and the cleanliness of the cooling pipes are important factors affecting the condenser vacuum. The cleanliness of the cooling pipes depends on the operating conditions of the rubber ball cleaning device. Analyzing the operation limitations of the traditional condenser rubber ball cleaning devices and comparing the theoretical research and operation results of domestic optimization technology in recent years, the unreliable technical route are identified and the optimal solution for the actual conditions of the power plant units are obtained.
    Fault analysis and treatment during commissioning period of a new 350MW supercritical heating unit
    AN Zongwu1,MENG Yingqi1, LIU Chao1,LI Changhai1,WU Zhongsheng2
    2018, 40(7):  50-53. 
    Asbtract ( 209 )   PDF (730KB) ( 625 )  
    Related Articles | Metrics
    The 350MW heating unit with separated high and medium pressure subcylinder which is made by Harbin Steam Turbine Factory Company Limited takes a new steam sealing to improve cylinder efficiency. But it also brings certain problems to the start and operation of the steam turbine. During commissioning period of the unit, there were large bearing vibration, water contained in lowpressure shaft seal, serious steam leakage of highpressure cylinder at shaft end and other faults. Through the onsite troubleshooting, measures such as increasing the rotation rate set point of units warming , optimizing the valve flow control, reinforcing the vibration measuring bracket, eliminating the cylinder expansion resistance, and correcting the highspeed dynamic balance of rotor were taken. After the treatment, the main faults in the generating units are eliminated, which ensures the 168hour successful trial of the retrofit unit with full load.
    Analysis and treatment of longtime cold start of a 330MW steam turbine in a power plant
    SUN Haiyuan
    2018, 40(7):  54-55. 
    Asbtract ( 438 )   PDF (695KB) ( 645 )  
    Related Articles | Metrics
    During the cold starting process of a 330MW steam turbine of a company, due to unqualified impulse starting parameters, large temperature difference between high pressure  and  intermediate pressure cylinder caused by uneven expansion of different parts of the cylinders, and large vibration of shaft system, the unit took too long term from starting to gridconnection. It analyzes the influencing factors and puts forward solutions to solve the problem of too longtime start and improve the safety and economy of the unit.
    Reason analysis and countermeasures of ash sloughing in 1000MW doublereheat tower type boiler
    CUI Xiaoguang
    2018, 40(7):  56-58. 
    Asbtract ( 160 )   PDF (772KB) ( 729 )  
    Related Articles | Metrics
    Taking a 1000MW ultrasupercritical doublereheat updraft boiler an example, it considers from the structure arrangement of the heating surface, the flow rate of flue gas, the concentration of fly ash etc. It explores the main cause of ash deposition on the heating surface, and studies the reasons for ash sloughing. The countermeasures are put forward to guarantee the stable and safe operation of boilers.
    Technical and economic analysis of natural gas heating by waste heat of LM2500+G4 gassteam combined cycle generator
    MA Qin1,2,LI Wei1,2,CHANG Nana1,2,WANG Chenxi1,2
    2018, 40(7):  59-61. 
    Asbtract ( 148 )   PDF (730KB) ( 786 )  
    Related Articles | Metrics
    The LM2500 + G4 gassteam combined cycle generator makes use of the waste heat from the HRSG to heat the natural gas intake system. The intake gas temperature is 20℃ normally and will be heated to 30~80℃.Through comparative analysis, the technical and economic performance is optimal when heating natural gas to 80℃, which not only significantly improves the comprehensive energy utilization efficiency of distributed energy system with LM2500 + G4, but also improve the economy, reliability and safety of the generator. Low temperature corrosion can be effectively prevented.
    Vibration fault analysis and countermeasure of lowpressure bearing of a 1000MW unit
    WANG Hui
    2018, 40(7):  62-63. 
    Asbtract ( 103 )   PDF (740KB) ( 603 )  
    Related Articles | Metrics
    The cause analysis and treatment to the large vibration of #7 bearing of lowpressure cylinder in a 1000MW unit are made. Through the reinforcement of the condenser support pipe at lower part of lowpressure cylinder bearing, over vibration of the bearing is effectively solved. The scheme is simple, reliable and of low cost, which provides guarantee for the longterm safe and reliable operation of the unit and provides reference for relevant personnel.
    Business strategy simulation and trading strategy of power generation enterprises
    WANG Huixiang1,WANG Qiuming2
    2018, 40(7):  64-67. 
    Asbtract ( 112 )   PDF (776KB) ( 575 )  
    Related Articles | Metrics
    With the continuous deepening of China’s new power system reform, the competition model of the power market has been continuously updated, and power generation enterprises are facing unprecedented threats and challenges.According scheme of electric industry reform, power generation enterprises is gradually reducing the electricity output while their market proportion of electricity is keeping increasing. Therefore, power generation enterprises should make full use of the cost model, and conduct business simulation analysis and market electricity trading strategy research in advance according to business data of the enterprise. Besides, power generation companies can make full use of the external market to control costs and maximize the profits of enterprises.
    Problems and countermeasures of technical management on overseas EPC projects
    CAO Chen
    2018, 40(7):  68-69. 
    Asbtract ( 136 )   PDF (698KB) ( 912 )  
    Related Articles | Metrics
    Considering 3 engineering procurement construction (EPC) projects of thermal power in Sumatra, Indonesia, technical management problems and their causes existing in the fulfillment of overseas EPC projects are found out, according to technical management analysis. Solutions and advice is proposed, which provide reference for the better implementation of EPC projects.
    Study on optimization scheme of circulating water in system commissioning period of a domestic nuclear power plant
    BAO Huanming, LIU Kenan
    2018, 40(7):  70-73. 
    Asbtract ( 101 )   PDF (1012KB) ( 637 )  
    Related Articles | Metrics
    A domestic nuclear power plant is the first AP1000 nuclear power plant in the world, and it is also the first domestic nuclear power plant using circulating pump with adjustable blade structure. The circulating water system is the debugging basis of the conventional island process system. Its debugging schedule is critical to other systems’ debugging. According to the characteristics of the circulating water system in the nuclear power plant, the commissioning period is optimized, which greatly shortens commissioning period of the system.
    Annual energy utilization efficiency improvement scheme for buildingtype natural gas distributed energy system
    YU Li1,2, ZHANG Zhen1,2
    2018, 40(7):  74-76. 
    Asbtract ( 163 )   PDF (811KB) ( 625 )  
    Related Articles | Metrics
    Due to the influence of mass concentration characteristics and corrosivity of lithium bromide solution, the exhaust gas temperature of the flue gas hot water lithium bromide unit of buildingtype distributed energy system cannot be lower than 160℃ during cooling period in summer. In order to reduce the exhaust gas temperature of the system, it proposes 2 schemes which are setting up a flue gas hot water heat exchanger at the exhaust outlet of the lithium bromide unit and providing domestic hot water externally, or increasing hot water flow that flow into the lithium bromide unit. Taking a distributed energy system project as an example, the annual average energy utilization efficiency of the 2 schemes are calculated and the results show that setting up flue gas hot water heat exchanger can reduce the system exhaust gas temperature, and greatly improve the annual average energy utilization efficiency.