    Analysis on reasons of oxide skin shedding from (ultra) supercritical boiler and preventive measures
    CHEN Yuan;WANG Xu
    2013, 35(1):  1-3. 
    Asbtract ( 730 )  
    Related Articles | Metrics

    According to analysis on the reasons of oxide skin forming and shedding in the (ultra) supercritical boiler and combining with practical examples, the effective measures were adopted to control the rate of the oxide skin forming and shedding. The pipe blockage fault by oxide skin was reduced, and the reliability of the equipment was improved.

    Measures for preventing water wall overheating in wet/dry state transition process of ultra supercritical boiler
    LIU Gang
    2013, 35(1):  4-6. 
    Asbtract ( 834 )  
    Related Articles | Metrics

    In the wettodry state transition process of the wall tangential firing ultra supercritical boiler, due to that the radiated heat load increases and the heat exchange coefficient of the medium inside pipe reduces, the tubes of the vertical water wall may be overheat easily. Combining with the experience of starting and debugging of the 680MW ultra supercritical boiler in Hubei Xisaishan Power Generation Company Limited, the reasons of overheat of water wall tubes in back fire side in wet/dry state transition process were analyzed, and concrete preventive measures were put forward.

    专题综述
    Treatment of common problems in operation of steam turbine of 600MW supercritical unit
    ZHOU Jinshun
    2013, 35(1):  7-9. 
    Asbtract ( 579 )  
    Related Articles | Metrics
    The characteristics of the N600-24.2/566/566 type supercritical unit were introduced. The common problems occurred in operation of this type unit were summed up and analyzed. The methods to solve these problems were proposed and implemented, and favorable result was obtained.
    研究与开发
    Experimental research on combustion optimization for 600MW subcritical boiler
    LI Qiang;CHEN Min
    2013, 35(1):  10-15. 
    Asbtract ( 564 )  
    Related Articles | Metrics
    Aiming at the 600MW subcritical drum boiler of Guohua Ninghai Power Plant, an experiment of combustion optimization control was carried out. Under different load, some measures, such as to change the air distribution mode, to reduce the parameters of the primary air and to control the oxygen properly, were adopted. Under various load points, the power consumption of the three fans (the induced draft fan, the forced draft fan and the primary air fan) was reduced. The mass concentration of the NOx emission was reduced. The overall economic efficiency of the boiler was improved. Simultaneously, the capacity margin of the fans was increased. According to the experimental results, the boiler optimal operation instruction sheets were formulated, which can be used as reference for economic operation of boiler of power plant.
    Application of buoyancy tank type hydraulic power generating device installed in sluice hole
    WANG Xu;CHEN Jun;CAO Baohua
    2013, 35(1):  16-18. 
    Asbtract ( 564 )  
    Related Articles | Metrics
    The difficulties of translation of the irrigation water resource in flat area into electric energy were introduced. The shortage of installation of removable power generation device in sluice hole was analyzed. The design and model selection of the improved device were expounded. The practical application of the device was evaluated.
    Design of communication system of wind power converter based on BX3100 PLC
    SUN Yongjia;ZHENG Dongshan;YAO Guangxiu;ZHUANG Jun
    2013, 35(1):  19-22. 
    Asbtract ( 584 )  
    Related Articles | Metrics

    bstract:The functions and the features of the master control system in wind power generation system were introduced, and the communication mode of the master control system was described. According to the requirement of the practical project, the communication system of the wind power converter was designed, in which the RS232 serial port communication was adopted, and the BX3100 PLC was selected and used as the ProfibusDP slave station. The Profibus bus communication between the wind power converter and the master control system were realized by the communication system. The principle and the program flow of the system were expounded, and the test results were given.

    研究与开发
    Analysis on optimization of heat transfer performance of gravity assisted heat pipe
    CHENG Weiliang;DI An;JI Hui;GOU Jianhui
    2013, 35(1):  23-26. 
    Asbtract ( 494 )  
    Related Articles | Metrics
    The heat pipe has important application value in industrial residualheat utilization and some other special industries. Thus, the research on heat transfer performance optimization and comprehensive design is of great significance. The three factors influencing on the heat transfer performance of gravity assisted heat pipe, which include the fin in pipe outside, the pipe shell diameter and the working fluid filling ratio, were analyzed. The relation between the fluid filling ration and the input heatflow density, which can cause the heat pipe to fail, was found by experiment. Based on the experimental data, the influences of the heatflow density on the vaporliquid distribution inside the heat pipes with different fluid filling ratio were analyzed emphatically.
    Design of power plant ground grid based on IEEE Std 80—2000 and software EDSA
    HUANG Jianbo;YAO Qi;ZHAO Mo
    2013, 35(1):  27-29. 
    Asbtract ( 667 )  
    Related Articles | Metrics
    The file IEEE Std 80—2000 “Guide for Safety in AC Substation Grounding” was introduced. Using the software EDSA, the designed ground grid was simulated and analyzed. The simulation result was compared with the result calculated according to the file DL/T 621—1997 “Grounding for AC Electrical Installations”. The result shows that the software drawing can substitute for traditional complex calculation process at all and can improve the efficiency and accuracy of design work.
    Filter tuning experiment method based on Matlab
    DING Xuanwen
    2013, 35(1):  30-32. 
    Asbtract ( 497 )  
    Related Articles | Metrics

    Taking the doubletuned filter in a converter station as example, using the Matlab software simulation, the tuning frequencies of the filter under different combination of the filter taps and the impedances and phases under the frequencies were calculated. The tap combination of the filter, which can satisfy the design requirement best, was obtained. The correctness of the simulation computation was proved by the field tuning experiment data.

    研究与开发
    Analysis on output voltage and circuit of tester in the process of the distance protection
    ZHAO Lang
    2013, 35(1):  33-37. 
    Asbtract ( 595 )  
    Related Articles | Metrics
    bstract:The distance protection of transmission line in the process of testing input many parameters, including impedance, angle of impedance,fault types,short circuit current,rated voltage, zerosequence compensation coefficient and so on. According to the request of parameters put into, relay protection testing device can be calculated automatically with the calculation program and the generation of voltage and current test required, but without corresponding calculation process. By through analysis of calculation in process of tester output voltage, current , enable testers to clear from the theoretical principle of distance protection test in various short circuit faults,the result of this paper provide refercece for operator relate to testing.
    技术交流
    Problems occurred during commissioning of 660 MW Heller indirect air cooling unit and treatment measures
    DONG Lin;ZENG Yajie;MA Yong
    2013, 35(1):  38-41. 
    Asbtract ( 577 )  
    Related Articles | Metrics
    In the commissioning process of the 660MW Heller indirect air cooling thermal power unit, the conditions of air cooling system control logic and the water film of circulating water were deteriorated, and an accident of the rupture membrane breakdown in low pressure cylinder occurred without sufficient operation experiences. The accidents were analyzed. The efficient measures were adopted, and the faults were treated.
    Analysis on parallel running of two onload voltage regulating transformers with different parameters
    LIU Heng;WU Qiong;WU Wenbin;TANG Haixia
    2013, 35(1):  42-45. 
    Asbtract ( 599 )  
    Related Articles | Metrics
    Aiming at the problem of abnormal reactive power distribution of two parallel running 220kV transformers of Shangmiao substation manufactured by different factories, according to relevant theory, combining with practical running situations, the ring current of highvoltage side and middlevoltage side under parallel running condition was analyzed, and the treatment measures were proposed.
    Problems in variable frequency control of boiler primary air fan and countermeasures
    ZHANG Bo;KONG Linghui;FENG Hongwei;SHANG Haifeng;TIAN Shupeng
    2013, 35(1):  46-48. 
    Asbtract ( 693 )  
    Related Articles | Metrics
    After the variable frequency reformation of the boiler primary air fan of a power plant, the frequency converter of the primary air fan failed frequently and led the air fan to trip, and after the fan tripped, some problems exist in loading process of the fan in restarting, which influence on safe and stable operation of the unit seriously. The all links of the variable frequency control of the primary air fan were analyzed, and targeted optimization reformation was carried out. The test shows that the optimization reformation realizes the design goal and provides good basis for safe and stable operation of the unit.
    Optimal control strategy of main steam temperature
    ZHANG Shujuan;DONG Kechang
    2013, 35(1):  49-51. 
    Asbtract ( 579 )  
    Related Articles | Metrics

    The main steam temperature has characteristics of the large inertia, the large delay, the nonlinearity and strong nondeterminacy. Aiming at this complex control object, an optimal control scheme based on water/fuel ratio was adopted to control the main steam temperature. The analysis of the real time operation curve of the unit shows that the scheme is effective.

    技术交流
    Improved connection scheme for potential transformer of generator of S109FA unit
    WANG Qiqin
    2013, 35(1):  52-53. 
    Asbtract ( 639 )  
    Related Articles | Metrics
    The original cause of starting up of level F gas turbine generation unit with frequency conversion was introduced. Taking the S109FA unit as example, the different points between the typical connection of generator PT and the conventional connection were analyzed. The improvement scheme for PT typical connection was put forward, which is helpful for ensuring safe operation of the unit.
    Analysis on reasons of higher total hydrocarbon in generator stator cooling oil
    GUO Guangwu
    2013, 35(1):  54-56. 
    Asbtract ( 550 )  
    Related Articles | Metrics
    The reasons of higher total hydrocarbon in TBM-160-2 generator stator cooling oil were analyzed. The finding method of the overheat points of stator, the treatment method and the control measures of total hydrocarbon in operation were introduced. The results in this paper provide operation and maintenance experiences for largecapacity generator with oil cooled stator, which will be imported or manufactured in china.
    Electricbag composite dust collector and application in coalfired power plant
    LI Gengxiang;GAO Mingfeng
    2013, 35(1):  57-60. 
    Asbtract ( 632 )  
    Related Articles | Metrics
    The research, application, structure and performance characteristics of the domestic and foreign electricbag composite dust collectors were expounded. Aiming at the application effects of domestic electricbag composite dust collectors, the influence of the ozone generated by highvoltage electric field on the service life of the PPS filtering material and the influence of the gas flow distribution between the electric zone and the bag zone on the performance of the dust collector were analyzed. The electricbag composite dust collector is suitable for application in precipitator reformation project for efficiency improving,and in order to ensure the precipitator to operate normally and perfectly, it is necessary to select the filter material with strong antioxidant ability and to reduce the secondary voltage of the precipitator electric field. For new projects, especially the projects without the semidry desulphurization and SCR denitration devices, the electricbag dust collector is not recommended.
    Optimization of slag discharging system of coal gangue CFB unit
    LIANG Xiaoyu;SHI Lu
    2013, 35(1):  61-62. 
    Asbtract ( 526 )  
    Related Articles | Metrics
    The coking and blockage by slag of the slag discharging system of the coal gangue CFB boiler in Shanxi Yuguang Power Plant were analyzed. The parameters and control mode of the slag discharging equipments in operation were optimized. The problems of coking and blockage by slag in the slag discharging system were solved, and the safety and economical efficiency of the unit operation were improved.
    Analysis on stator ground fault of generator No.2 in Xinzhuangzi Power Plant
    GE Xiujun
    2013, 35(1):  63-64. 
    Asbtract ( 607 )  
    Related Articles | Metrics
    A fault trip accident was occurred in the generator No.2 of Xinzhuangzi Power Plant, which was caused by the stator ground fault. The fault point was found. The reasons of the fault were analyzed. Adopting effective measures, the fault had been treated.
    Analysis on outlet circuit breaker configuration for heavy duty gas turbine generator
    GAO Zhixiang
    2013, 35(1):  65-66. 
    Asbtract ( 665 )  
    Related Articles | Metrics
    The startingup features of the gas turbine were introduced. When the gas turbine is startedup by static frequency converter, the advantages and the disadvantages of the circuit breaker configured in generator outlet (GCB) were analyzed, and an example without the generator outlet circuit breaker (GCB) was given.
    Analysis on reasons of tripping of unit No.3 in Wangting Power Plant
    BAO Xiaojun
    2013, 35(1):  67-68. 
    Asbtract ( 636 )  
    Related Articles | Metrics

    The unit No.3 of Wangting Power Plant tripped three times continuously. The composition of the turbine and boiler control system of unit No.3 and the features of SIMENS T3000 control system were introduced. The reasons of the unit tripping were analyzed. The problems existed in new system digestion, absorbing and debugging and device type selection were pointed out. The relevant solution was put forward.

    节能与环保
    New type chemical clean technology for GGH of wet desulphurization system and application
    CHEN Tongqian;ZHANG Guoxin;ZHU Yunshui;LU Jun;ZHOU Haiming
    2013, 35(1):  69-71. 
    Asbtract ( 659 )  
    Related Articles | Metrics
    In order to solve the problems of scaling, blockage and corrosion of the GGH of limestonegypsum wet desulphurization system, a new type chemical clean technology for GGH was proposed, in which it is not needed to dismantle the heat transfer elements. The neutral chemical cleaning agent will be sprayed on the GGH surfaces directly. The cleaning period of the new technology is shorter. The scaleremoving efficiency of the new technology is not less than 95%. The neutral chemical cleaning agent does not corrode the heat transfer elements and devices. The waste water of chemical cleaning will be treated in the power plant waste water system and discharged as qualified waste water. The operation rate of the desulphurization system, the GGH of which had been cleaned by the new technology, was increased by more than 0.5%. The SO2 emission was decreased, and favorable social effect was obtained. According to the estimation, to clean a 600MW unit one time in a overhaul period can generate the economic benefit ¥1,000,000~2,000,000 in one year.
    新能源
    Analysis on power relation of doublyfed wind power generator
    XIAO Yao;GUO Wei;ZHUANG Jun;LUO Hao;
    2013, 35(1):  72-77. 
    Asbtract ( 597 )  
    Related Articles | Metrics
    The active power and reactive power of stator of doublyfed wind power generator is controlled by the rotor voltage control. The relation between the rotor power characteristics and the converter capacity design was analyzed. The equivalent circuit of the doublyfed power generator was deduced. The power distribution relation of the stator and rotor of the generator was calculated by the equivalent circuit. Using the Matlab software, the rotor current and voltage variation characteristics of the doublyfed generator and the power distribution relation of the generator stator and rotor under different conditions were simulated and verified. According to practical example analysis, the design method of the main circuit hardware of the doublyfed converter was proposed.