Loading...

Table of Content

    25 December 2016, Volume 38 Issue 12
    Discussion on the calculation formula of deflection at effective cantilever end of gantry crane
    HU Ting1, YAN Yuping2
    2016, 38(12):  1-5. 
    Asbtract ( 320 )   PDF (1129KB) ( 778 )  
    Related Articles | Metrics

    Abstract:Taking 1250kN gantry crane as an example, this paper calculates the deflection at effective cantilever end using two methods, one is the theoretical calculation formula of defection in Crane Design Manual, and the other is finite element software. The result shows that the theoretical deflection value is smaller than the value obtained by finite element software. By derivation, it is found that displacements of shear deformation and tensile deformation are not considered in the theoretical calculation formula. After that, this paper calculates the defection using the derived formula and its result is incredibly close to that of finite element calculation, which shows that the derived formula has great practicality.

    Study on electric motor protection scheme of high voltage variable frequency system
    2016, 38(12):  6-8. 
    Asbtract ( 303 )   PDF (842KB) ( 475 )  
    Related Articles | Metrics
    Abstract:For the characteristics of high voltage variablefrequency electric motor transformation, a differential protection is formed using double criterions of phasor differential and sampled values differential based on frequency tracking. This paper introduces the configuration scheme of variablefrequency electric motor protection, and expounds the frequency tracking method that combining zerocrossing detection algorithm and Fourier algorithm. After that, a simulation experiment of developed protection device is conducted, and the result shows that this device could provide rapid and reliable protection for variablefrequency electric motor under different frequencies.
    Electromagnetic ultrasonic guidedwave technology application on steel rope testing
    YU Shumin, LIU Xuefang
    2016, 38(12):  9-11. 
    Asbtract ( 247 )   PDF (1990KB) ( 403 )  
    Related Articles | Metrics
    Abstract:Due to the structure and different service environment, steel rope test is difficulty. The principle of electromagnetic ultrasonic guidedwave technology was introduced. Application of electromagnetic ultrasonic guidedwave technology on steel rope test was test verified. Because of ultrasonic will spread in steel rope as guidedwave, the ultrasonic signal of defections will be immediately indicated. Long distance and fast steel rope test will be fulfilled. 
    Thermal power project cable and cable tray settlement method study
    YAN Tao, HE Shengli
    2016, 38(12):  12-14. 
    Asbtract ( 270 )   PDF (706KB) ( 424 )  
    Related Articles | Metrics
    Abstract:Cable lying and cable tray installation is an important process in thermal power plant construction. There is always big difference between design quantity and real work quantity. Based on practical experience, a design material and site measurement incorporated settlement method was indicated. The difficulty of cable and cable tray settlement was solved. Audit risk was avoided. Building cost was reduced. 
    Intelligent substation information security strategy discuss
    YAO Liang1,2, ZOU Lei1,2, HAN Zhiyong1,2
    2016, 38(12):  15-17. 
    Asbtract ( 309 )   PDF (1015KB) ( 669 )  
    Related Articles | Metrics
    Abstract:There are two kinds of massage signal of intelligent substation, process layer massage and control layer massage. Information security to follow the “safe partition, network, horizontal isolation, longitudinal certification” principle, through encryption, digital signatures, the virtual network, such as firewall and intrusion detection technology, rely on the active defense with passive defense, build up two lines of defense of the information security protection, enhance the information availability, confidentiality, integrity, and nonrepudiation.
    AP1000 passive residual heat removal system common case failure study
    ZHOU Lanyu1, QI Shi2, ZHOU Tao2
    2016, 38(12):  18-20. 
    Asbtract ( 306 )   PDF (925KB) ( 420 )  
    Related Articles | Metrics
    Abstract:Based on risk spectrum software, impact analysis of common case failure (CCF) of AP1000 passive residual heat removal system (PRHRS) was carried out by applying multiple Greek letter model (MGL). Situation with and without CCF were both calculated. Without CCF, the PRHRS failure probability is 9.559×10-6. With CCF, the PRHRS failure probability is 2.008×10-4. In this comparison, we can find that, without considering CCF, the PRHRS is mainly effected by heat exchanger leakage and IRWST failure. And, with considering CCF, the main cause of PRHRS failure is pneumatic valve CCF.
    Multipleregressionbased anchor cable dynamometer data correction and application
    HOU Guangqiang1, PENG Hao2
    2016, 38(12):  21-24. 
    Asbtract ( 249 )   PDF (728KB) ( 501 )  
    Related Articles | Metrics
    Abstract:Prestress anchor cable is wide used in geotechnical reinforcement. Anchor cable dynamometer is used for effective prestress force longterm measurement. Existing anchor cable dynamometer data correction method was discussed. Incorporated with large quantity of measured data, the application of multipleregressionbased anchor cable dynamometer data correction method was stated. The result of practical application examined the accuracy of this method, and it is able to reflect the real operation condition. 
    Combined cycle unit without start up boiler possibility analysis and application
    LI Shucai, WEI Jing, ZHANG Li
    2016, 38(12):  25-27. 
    Asbtract ( 241 )   PDF (884KB) ( 702 )  
    Related Articles | Metrics
    Abstract:The applicability and possibility of not provide startup boiler was discussed based on gas steam combined cycle unit shaft configuration. Combined with project practice, in the situation of without startup boiler or other external steam, the design and application of unit auxiliary steam system was studied.
    Adjustment of oxygen content deviation at economizer outlet of a 330MW subcritical W—flame boiler
    CHEN Hui, XUE Hai, HUANG Qilong, DAI Weibao
    2016, 38(12):  28-30. 
    Asbtract ( 227 )   PDF (889KB) ( 622 )  
    Related Articles | Metrics
    Abstract:Taking the 330MW unit of YF Power Plant as an example, this paper analyzed the reasons of oxygen content deviation at boiler economizer outlet. And through some measures, such as primary air hot leveling, powder deviation adjustment, air distribution mode adjustment and separator baffle opening adjustment of coal mill, etc., this paper solved the problem of large oxygen content deviation at boiler economizer outlet, which improved the combustion uniformity of furnace and the boiler efficiency is increased about 0.2 percentage point.
    220kV linebreaker incorrect action accident analysis
    ZHANG Jianjie
    2016, 38(12):  31-32. 
    Asbtract ( 238 )  
    Related Articles | Metrics
    Abstract:Bases on an accident of 220kV line breaker incorrect action, by analyzing schematic diagram and record data, it was indicated that the incorrect action was caused by breaker acted too fast that tripping circuit didn’t act. Protective measurements were indicated.
    Thick plate tee connector fusionthrough welding new procedure
    HUANG Peibing, WAN Yueying, HU Lijuan
    2016, 38(12):  33-34. 
    Asbtract ( 274 )   PDF (728KB) ( 523 )  
    Related Articles | Metrics
    Abstract:Existing thick plate tee connector composite fusionthrough welding has obvious drawback. By study and improvement, a new welding procedure was indicated, which is high efficient, easy to maintain quality and requires less craftsmanship. 
    Long span portal type reclaimer peration analysis
    ZHANG Jiuchang, YANG Gongxiao
    2016, 38(12):  35-36. 
    Asbtract ( 186 )   PDF (867KB) ( 564 )  
    Related Articles | Metrics
    Abstract:Based on the case of inconsistence of design working condition and real working condition of Xuzhou Coal Mining Group Hami Energy Company Limited’s Hami Dananhu Mine East  #5 mine closed closed strip coal storage reclaimer, by introducing the working principle and theoretical calculation, the cause of low capacity was indicated. 
    Calculation of directional overcurrent protection sampling value based on network synchronization
    ZHU Chongyang, ZHANG Hua
    2016, 38(12):  37-38. 
    Asbtract ( 187 )   PDF (878KB) ( 393 )  
    Related Articles | Metrics
    Abstract:At present, distribution network is not dependent on the voltage, but through the current sampling value method to calculate the direction of flow, for the sampling values at both ends of the synchronous high demands are put forward. Put forward by network transmission to adjust the current sampling values of synchronization algorithm, phase difference on both ends of the current are calculated, at the same time have the effect of direction overcurrent protection. This scheme not only can well solve the synchronization of sampling values, accurate judgment flow phase, but also avoid the hardware design is too complicated, reduce the use of direction overcurrent components. This plan has set up a file in the double circuit line distribution system to test and verify.

     

    Fault treatment research based on distribution network automation
    GU Yan, GUI Minqi
    2016, 38(12):  39-41. 
    Asbtract ( 256 )   PDF (941KB) ( 499 )  
    Related Articles | Metrics
    Abstract:The experimental project of distribution network automation in Suzhou was briefly introduced. Basic function of OPEN3200 system was introduced. Typical distribution network failure treatment cases in Suzhou was studied. Meanwhile, the improvement suggestion for OPEN3200 system was indicated, which is fundamental for the construction and promotion of following distribution network automation.
    A power plant’s 300MW thermal power unit inducedfanand booster fan unification improvement study
    DONG Jinlu, LIU Bin, DU Liang
    2016, 38(12):  42-44. 
    Asbtract ( 435 )   PDF (848KB) ( 768 )  
    References | Related Articles | Metrics

    Abstract:After ultralow emission improvement, the joint operation of induced fan and booster fan of a power plant’s 300MW thermal power unit did not satisfy the use requirement. Hence, the unification of induced fan and booster fan was carried out. Authors adopted hot state test and performance curve to analyze working status and air and flue gas system resistance, and determined the unification plan. After removed booster fan, the comprehensive efficiency of new induced fan is significantly increases. Unit operation safety was ensured. 

    Effect of environment factor to corrosion behavior on pure titanium in desulfurized wet flue gas condensate
    LIU Chunbo1, WANG Haitao1, WANG Zhengbin2, HU Hongxiang2, NIU Cong2
    2016, 38(12):  45-49. 
    Asbtract ( 241 )   PDF (3192KB) ( 487 )  
    Related Articles | Metrics
    Abstract:Due to fine corrosion resisting property, industrial pure titanium is considered as the ideal material for thermal power plant desulfurization wet stack anticorrosion liner. Adapted corrosion electrochemistry method, the effect of environment factor to corrosion resisting property on TA2 pure titanium in simulated desulfurized wet flue gas condensate was studied. The result indicated that the corrosion resisting property of pure titanium was mainly determined by pH and HF content of the condensate. If pH is higher than 3.0 or HF content is low enough, pure titanium is in selfpassivation behavior, with high corrosion resisting property. In contrast, pure titanium is in activationpassivation behavior, corrosion resisting property is relatively poor. In addition, temperature and flow velocity of condensate increased corrosion rate. Other changes were caused by anodic passive film dissolution due to HF was accelerated. 
    300MW circulating fluidized bed unit technically improve and operation optimization combined
    CHEN Jianxin
    2016, 38(12):  50-52. 
    Asbtract ( 229 )   PDF (773KB) ( 468 )  
    Related Articles | Metrics
    Abstract:To face national power green and new energy developing and the electric power market reform advancement, results in the sharply decrease of thermal power unit utilization time in Yunnan, the thermal power enterprise overall loses since 2015. In the severe market competition environment, only dig company 2×300MW unit energy saving potential of circulating fluidized bed boiler, “internal control cost, efficiency increasing” to ensure that the unit important production leading economic indicators in this area, can effectively improve the thermal power enterprise’s market competitiveness.

    Application of elevated cagetype dry fog dust remove system on stackerreclaimer in coal dome

    DENG Ruyong, WANG Lei, YAN Min
    2016, 38(12):  53-55. 
    Asbtract ( 179 )   PDF (826KB) ( 0 )  
    Related Articles | Metrics
    Abstract:The present dust pollution situation of Guodian Jianbi Power Plant coal dome was introduced. The selection of coal dome stackerreclaimer dust control improvement construction was discussed. The principle, structure and features of elevated cagetype dry fog dust remove system was analyzed. Practical result indicated that elevated cagetype dry fog dust remove system effectively controlled the inorganized dust emission in each process of coal conveying system. 
    Application analysis of pure ultrahigh molecular weight polyethylene pipe fitting in wet desulfurization system
    CHEN Kuan
    2016, 38(12):  56-58. 
    Asbtract ( 173 )   PDF (885KB) ( 364 )  
    Related Articles | Metrics
    Abstract:Due to the slurry characteristics, slurry pipe in thermal power plant wet desulfurization system requires well anticorrosion and well wearproof property. By a twoyearlong application and test of a new type ultrahigh molecular weight polyethylene (UHMWPE) material pipe and pipe fittings, its anticorrosion and wearproof property was proved. It is able to replace conventional stainless steel pipe, rubber lining and plasticlined pipe fittings in wet desulfurization. Considering its price advantage, this material worth spreading. 
    600MW unit desulfurization device auxiliary power supply system improvement design
    WANG Dongya, ZHANG Guiping, LIN Zhenyu
    2016, 38(12):  59-61. 
    Asbtract ( 246 )   PDF (1054KB) ( 516 )  
    Related Articles | Metrics
    Abstract:During the environmental protection improvement reconstruction of Guangdong Zhuhai Jinwan Power Company’s No.3 unit, existing equipment were sufficiently utilized. Auxiliaries power supply system was improvement designed. By changing connection method and improving auxiliaries power supply protection system, desulfurization system was effectively spared. The reliability of desulfurization system was significantly increased. The stability of unit was ensured after gas bypass was eliminated.
    Complex terrain wind turbine generator free stream wind speed test method study based on laser radar anemoscope
    ZHANG Wei1, LEI Yang1, DU Chengrong2
    2016, 38(12):  62-66. 
    Asbtract ( 306 )   PDF (953KB) ( 407 )  
    Related Articles | Metrics
    Abstract:Free stream wind speed is one of the most important parameters of wind turbine generator power curve evaluation, postwarranty acceptance and operation. Traditional method is to use anemometer tower with the drawback of long test term, high test cost and difficult construction, especially in complex terrain. Based on IEC 61400-12-1—2015 standard, utilizing of high accuracy, wide range and easy to installation laser radar anemoscope, a series of free stream wind speed measure method that suit for complex terrain was indicated. After taking tests of free stream wind speed by airborne radar anemoscope in different distance, free stream wind speed can be determined based on wind speed variation trend. The accuracy and reliability of wind speed can be verified by land laser radar anemoscope. Based on the experiment carried out in a wind power plant in Yunnan, the test method is effective.
    Study on the influence rules of wind turbine revolving speed to gear box vibration
    WANG Tianpin1, KONG Detong2, LIU Qingchao2
    2016, 38(12):  67-69. 
    Asbtract ( 301 )  
    Related Articles | Metrics
    Abstract:Gear box is the main actuator for wind turbine unit and its state monitoring is essential for the safety operation of wind turbine unit. Because that wind turbine unit is greatly influenced by wind speed fluctuation, its revolving speed changes in real time, which increases the difficulty of gearbox state monitoring. Through analyzing the gear box vibration signals of two units for a certain wind power plant, this paper revealed the linear relationship between vibration signals and revolving speed. And after that, it proposes the solution of converting the vibration signals under arbitrary speed to rated speed, which effectively reduces the influence of revolving speed to vibration signals, improves the trend of monitoring indictors, and provides effective monitoring indictors for gear box state monitoring.
    Comparative study and application of draught fan power curves based on laser radar anemoscope
    LEI Yang1, MA Dong1, DU Chengrong2
    2016, 38(12):  70-72. 
    Asbtract ( 307 )   PDF (763KB) ( 698 )  
    Related Articles | Metrics
    Abstract:In this paper, power curves of different types of draught fans are accurately and rapidly measured using laser radar anemoscope. After that, a quantity standard disposal to the power and a comparative analysis of power curves refer to IEC 61400-12-1—2015 criterion are conducted, which confirm the optimal draught fan type and provide a reference for draught fan performance evaluation and wind power unit selection.